ELEKTRO SHAK - SK - BK

* Required field (*)
Company * E-mail *
Compiled by * City
Date*
(format dd-mm-AAAA)
Country *
ELEKTRO SHAK - SK - BK
Axis position
Duty Cycle
Phase nr. 1 2 3 4 5 6 7 8 9 10
Stroke in X (mm) +/- : according directions convention, see scheme 1
Time (s)
Mass to displace (kg) (i.e. gripper + part masses to move)
External force application position (mm)
+ or - : according directions convention, see scheme 2
Xg
Yg
Zg
External force (N) (i.e. cylinder/spring force to contrast)
+ / - : according directions convention, see scheme 1
Fx
Fy
Fz
Center of gravity mass to displace position (mm)
+ or - : according directions convention, see scheme 2
Lx
Ly
Lz
Usefull stroke requested (mm)
Dimension limits, if any
Axis must work "in position" mode (i.e. reaching a defined position, reacting against external forces), or "in torque" mode (i.e. pushing with controlled force against external obstacles in position not defined)?
It's required a feed-back check of:
Force (N) (brushless motor)
Position (mm) (stepping with encoder or brushless)
Worked hours per day (h/d)
Environmental conditions
Ambient temperature (°C)
Use conditions presence of dust, chips, etc.
"In-Line" or "Geared" motor? (where applicable)
Motor mounting position (where applicable)
Need for carriage braked with motor off
Motor and driver other than standard Metal Work
Accessories
cables tray chain
cables length
Main voltages availables
The control will be made with:
Short description of the application and notes: